HSE on oil and gas pipelines: pump station, route, tank farm

Working on live pipelines.With permits and Ex protection.

Pump stations, pipeline sections and tank farms usually keep running while construction, inspection or maintenance takes place. Hazardous areas, hot work, vessels and many contractors come together there. SAFETEE coordinates with HSE management on site and as SiGeKo under the German Construction Site Ordinance, aligned with the operator’s permit system.

Hazardous areas under the GefStoffV in viewPermit to work during operationSiGeKo for new build and rerouting
As of: 1 Nov 2026
Scroll
The pipeline.Oil & gas
Ex areaValveEx area01Pump stationEx area · permit02Pipeline sectionShoring · H&S plan03Tank farmVessel entry permit
Scroll: the light point follows the product from the pump station through the pipeline section into the tank farm.
01
In short

What does HSE on oil and gas pipelines mean?
Ex protection, permits, many contractors.

HSE on oil and gas pipelines means coordinating health and safety at pump stations, pipeline sections and tank farms, often during operation and in hazardous areas. SAFETEE provides HSE management on site, contractor coordination within the operator’s permit system and, for new build or rerouting, safety coordination under the German Construction Site Ordinance. For pipeline operators, tank farms and contractors.

The product keeps flowing

Maintenance, tie-ins and modifications often run next to pipelines and vessels in operation. Who may work where and when is set by isolation, draining and the operator’s permit to work.

Hazardous areas define the workplace

Where a hazardous explosive atmosphere can form, the operator classifies zones. Tools, vehicles and hot work need their own permit and gas testing there.

Station, route, storage

The pump station is an industrial plant, the route a moving site over many kilometres, the tank farm often an establishment under the Major Accidents Ordinance. Coordination has to know all three.

Part of the Grids & Pipelines station: all industries at a glance · Grid expansion & substations

02
What SAFETEE delivers on pipelines

Coordination during operation.
Aligned with the operator.

Responsibility for the installation, the explosion protection concept and the permit system stays with the operator. We make sure contractors, work steps and permits fit with it, and that everyone on site knows what applies.

01

HSE management on site

HSE managers at pump station, route and tank farm for operators, EPC contractors or construction companies: inductions, inspections, KPIs and coordination with authorities and the accident insurer.

02

Contractors and permit to work

We coordinate access and induction of all contractors and support the operator’s permit system: permits for hot work, vessel entry and hazardous areas are clear before work starts.

03

SiGeKo for new build and rerouting

When a pipeline is built or rerouted or a station is extended, the Construction Site Ordinance applies. We coordinate planning and execution with a health and safety plan for civil works, pipe laying and the tie-in to the existing installation.

Separately, our Safety Consulting advises pipeline and plant operators on duties and liability: Advice on operator liability. Consulting and operational coordination remain separate roles that complement each other.

Video-Loop
03
Typical hazards on pipelines

Four hazards.
From pump to tank.

Hazardous areas

In zone 1 a hazardous explosive atmosphere occurs occasionally in normal operation, in zone 2 only rarely and briefly. Sparks, hot surfaces and electrostatic charging must be excluded there as ignition sources.

Hot work during operation

Welding, cutting and grinding on or next to pipelines start only once fire and explosion hazards are removed or covered by a written hot work permit: draining, purging, gas testing, fire watch.

Tanks and confined spaces

Entering a tank or vessel requires an entry permit, gas testing by a competent person, a standby person and a rescue plan. Residues can keep releasing vapours even in a drained vessel.

Pipe trench and pipe laying

Trenches deeper than 1.25 m need sloping or shoring. Add pipe transport, lifts with sideboom or crane, buried third-party utilities and crossings of roads and watercourses.

Video-Loop
04
Figures and rules

What applies to pipelines.
With source and date.

40,000 km
Gas transmission network of the transmission system operators
approx., per FNB Gas
9,040 km
Hydrogen core network, approved
Federal Network Agency, 22 Oct 2024
5,300 km
Petroleum pipelines in Germany
approx., of which about 2,000 km crude oil (MWV, 2021)
> 16 bar
Operating pressure from which the High-Pressure Gas Pipeline Ordinance applies
GasHDrLtgV § 1

Sources: FNB Gas (accessed 2 Oct 2026); Bundesnetzagentur (Federal Network Agency), press release of 22 Oct 2024; Mineralölwirtschaftsverband, pipeline brochure 2021; Gashochdruckleitungsverordnung.

Which rules apply to explosion protection?

The Hazardous Substances Ordinance requires a risk assessment, zone classification (Annex I No. 1.7) and an explosion protection document (§ 6 (9)). The technical rules TRGS 720 to 724 specify this and have replaced the former TRBS 2152. Installations are inspected under the Industrial Safety Ordinance. Source: GefStoffV; BG RCI.

When does a pipeline project need a SiGeKo?

As soon as employees of several employers work on a new build, rerouting or extension. More than 500 person-days, or over 30 working days with more than 20 people, require prior notice. A health and safety plan is mandatory if prior notice is required or particularly hazardous work under Annex II takes place. Source: BaustellV §§ 2, 3.

Sources and regulations

As of: 1 Nov 2026

05
FAQ

What operators want to know
about pipelines.

Does building or rerouting a pipeline need a SiGeKo?

As a rule, yes. New build, rerouting and extension of pipelines and stations are construction projects under the German Construction Site Ordinance. If employees of several employers work on site, such as civil works, pipe laying and electrical installation, the client appoints a coordinator. With prior notice or particularly hazardous work under Annex II, a health and safety plan is also mandatory.

What is an explosion protection document?

It describes where a hazardous explosive atmosphere can occur, how the areas are classified into zones and which technical and organisational measures apply. The employer prepares it before work starts and keeps it up to date (§ 6 (9) GefStoffV). Contractors are inducted on this basis before starting work.

What does permit to work mean?

Permit to work is a work authorisation system. Hazardous work such as hot work, vessel entry or opening pipelines starts only once a responsible person has checked the work location and released the work in writing. The permit names the section, measures, measurements, validity and handback.

Who coordinates contractors during operation?

If several contractors work in one installation, the employers must cooperate under § 8 of the German Occupational Safety and Health Act. If they can endanger each other, they appoint a person under § 6 DGUV Regulation 1 to coordinate the work; with hazardous substances, § 15 GefStoffV requires a coordinator. SAFETEE takes on this role as contractor coordinator.

What applies when entering a tank?

Before entry, the responsible person issues an entry permit. The vessel is drained, isolated and gas-tested by competent persons, and the measurement is documented. During the work a standby person stays outside and rescue equipment is ready. The basis is DGUV Rule 113-004 for vessels, silos and confined spaces.

Which additional regulations apply to tank farms?

Besides occupational safety and explosion protection, the Ordinance on Installations for Handling Substances Hazardous to Water (AwSV) applies and, depending on the stored quantity, the Major Accidents Ordinance. For petroleum products the thresholds are 2,500 and 25,000 tonnes. Which duties apply in detail follows from the permit and the classification of the establishment.

06
Your pipeline project

Let’s talk about your pipeline, station or tank farm.

Type of installation, work during operation or construction project, planned period: with these details we estimate the coordination effort and get back to you within one working day.