Prior notice
For larger sites, to be sent to the competent authority at least two weeks before site setup and displayed visibly. We prepare and submit it.
As the client you carry the duties of the German Construction Site Ordinance (BaustellV). SAFETEE provides qualified safety and health coordinators (SiGeKo) who organise these duties for you: from the prior notice and the safety and health plan to site inspections. Fully documented.
Will employees of several employers work on the site?
Expected duration over 30 working days with more than 20 employees at the same time, or more than 500 person-days?
Are particularly hazardous works planned (e.g. fall heights over 7 m, trenches over 5 m, work near high voltage)?
The BaustellV obliges the client as soon as employees of several employers work on one site. SAFETEE takes over the implementation, the responsibility stays with you: and you know at all times that it is fulfilled.
For larger sites, to be sent to the competent authority at least two weeks before site setup and displayed visibly. We prepare and submit it.
With several employers, the client must appoint one or more suitable coordinators. Our coordinators meet the requirements of RAB 30.
Plan for the execution phase: trades, timing, hazards, measures. We prepare it during planning and adapt it on site.
Document with the safety-relevant information for maintenance, servicing and conversion after completion. We compile it.
German law has no formal term for a “large construction site”. What counts is duration, workforce, the number of employers and the type of work. Above these thresholds the Construction Site Ordinance (BaustellV) applies in full, and coordination becomes an ongoing task.
As soon as employees of several employers work on site, a coordinator must be appointed. On large projects that means dozens of companies: the SiGeKo aligns schedules, site set-up and mutual hazards.
More than 30 working days with more than 20 people on site at the same time, or more than 500 person-days: prior notice then goes to the occupational safety authority at least two weeks before the site is set up. It is displayed on site and updated after significant changes.
With prior notice, or with particularly hazardous work and several employers, a health and safety plan is mandatory before set-up. On large sites we update it with every construction phase.
This includes falls from more than 7 m, excavations deeper than 5 m, work closer than 5 m to high-voltage lines, certain hazardous substances and the assembly or dismantling of massive components by crane. The H&S plan sets out specific measures for this work.
New production plants, plant extensions and data centres are sites with their own rhythm: construction often runs next to ongoing operations, many building-services trades work at the same time, and installation overlaps with commissioning. We combine coordination under the Construction Site Ordinance with the operator’s rules.
Construction and live operations on one site: clear boundaries, handovers, permits to work and site access. The operator’s contractors and the client’s construction firms work within one coordination concept.
Tight schedules, many building-services trades, electrical and medium-voltage work and commissioning in parallel with installation. The H&S plan follows the construction phases and the handovers to the operator.
Substations, cable routes and overhead lines: civil works, steel and electrical installation meet work close to live equipment. Work closer than 5 m to high-voltage lines counts as particularly hazardous.
More: Industrial construction & major projects · Grid expansion & substations
In a dispute, what counts is what is documented. Our way of working is designed so that you can prove every duty.

Detailed reports and action logs show the status of safety performance at any time.
Regular, documented site inspections with deadline, responsible person and proof of completion.
Changes in the construction sequence are tracked. The plan is never outdated.
Prior notice, queries, visits: we communicate with the authority and the accident insurer.
Induction, coordination and proof for all employers on site.
Inspections and measures in the SAFETEE Suite: traceable, prioritised, available anytime.
As soon as employees of several employers work on your site, the client must appoint one or more suitable coordinators under § 3 BaustellV. This applies regardless of the size of the site. Only if a single employer carries out all work does the duty not apply.
If the expected duration exceeds 30 working days with more than 20 employees working at the same time, or if the scope exceeds 500 person-days. The prior notice must reach the competent authority at least two weeks before site setup and is displayed visibly on site.
If a prior notice is required, or if particularly hazardous works under Annex II of the BaustellV are carried out and employees of several employers are on site. The plan must exist before site setup and be adapted when things change.
The client violates the BaustellV. Breaches of the prior notice duty and the appointment of the coordinator are administrative offences and can be fined. If an accident occurs, questions of liability may arise. An appointed, qualified coordinator with complete documentation is your proof.
Yes. Under § 4 BaustellV the client may transfer the measures to one or more third parties, for example to SAFETEE. The transfer should be made in writing. The client's basic responsibility remains, we deliver the implementation.
Our coordinators meet the requirements of RAB 30 (rules for occupational safety on construction sites): construction expertise, occupational safety knowledge, coordinator knowledge and relevant professional experience. Many are additionally qualified occupational safety specialists.
This depends on size, construction phase and hazard level. We define the inspection rhythm together with you and document every inspection. During critical phases we increase presence.
Safety coordination fulfils the legal duties of the BaustellV. HSE management on project goes further: HSE concept, inductions, authority management and key figures for the whole project. On request we offer both from one source.
Ideally in the planning phase. The BaustellV already provides for the coordinator there, and an early safety and health plan saves time and rework on site. Joining a running project is also possible.
German law has no formal term for a large construction site. In practice the thresholds of the Construction Site Ordinance decide: more than 30 working days with more than 20 people on site at the same time, or more than 500 person-days, trigger prior notice. With several employers, a health and safety plan is then mandatory too.
Yes, as soon as employees of several employers work on site, which is practically always the case for production plants and data centres. If construction runs next to ongoing operations, we also align coordination under the Ordinance with the operator’s contractor coordination.
Annex II of the Construction Site Ordinance includes falls from more than 7 m, excavations deeper than 5 m, work closer than 5 m to high-voltage lines, certain hazardous substances, blasting and the assembly or dismantling of massive components by crane. The H&S plan sets out specific measures for this work.
On request we combine safety coordination with our other services for your construction project.
Concept, inductions, authorities, key figures
Integrate subcontractors safely
Occupational safety support
Capture hazards on site in under two minutes
For battery storage projects, see the article When a SiGeKo joins a battery storage project.
We tell you which BaustellV duties apply to your project and how we fulfil them. Free of charge and without obligation.